1Martinez T, Fouletier P, Park K H,et al. Virtual Enterprise: Organization, Evolution and Control.International Journal of Production Economics,2001, 74:225-238.
2Lee Kunwoo. Principle of CAD/CAM/CAE System. Boston,USA : Addison Wesley Longman Inc. ,1999.
3Case K, Hounsell M S. Feature Modelling: a Validation Methodology and Its Evaluation. Journal of Materials Processing Technology, 2000,107 : 15-23.
4Roy U, Xu Y. Computation of a Geometric Model of a Machined Part from Its NC Machining Programs. Computer- Aided Design, 1999, 31 : 401-411.
5Motwani J, Mirchandani D,Madan M,et al. Successful Implementation of ERP Projects. International Journal of Production Economics, 2002, 75 :83 - 96.
6Wang Huifen , Zhang Youliang. CAD/CAM Integrated System in Collaborative Development Environment. Robotics and Computer Integrated Manufacturing, 2002,18:135 - 145.
3Duijm N J, Fi6vez C, Gerbec M, et al. Management of health, safety and environment in process industry [ J ]. Safety Science, 2008,46 (6) :908 -920.
4Azadeh A, Rouzbahman M, Saberi M, et al. An adaptive neural net- work algorithm for assessment and improvement of job satisfaction with respect to HSE and ergonomics program:The case of a gas re- finery[J]. Journal of Loss Prevention in the Process Industries, 2011,24(4) :361 - 370.
5Azadeh A, Saberi M, Rouzbahman M, et al. An intelligent algorithm for performance evaluation of job stress and HSE factors in petro- chemical plants with noise and uncertainty[ J]. Journal of Loss Pre- vention in the Process Industries,2013,26 (1) :140-152.