摘要
无锡市城北污水处理厂设计规模为20×104m3/d,已建一期工程规模为5×104m3/d,二期工程扩建规模为5×104m3/d,污水处理工艺采用厌氧水解+组合生物选择器的Orbal氧化沟工艺,并增设了臭气处理装置。介绍了处理工艺流程、工程设计参数、设备配置情况等,并总结了设计特点及新设备的应用。
Anaerobic hydrolysis and integral bio-selector Orbal oxidation ditch are adopted in Chengbei Wastewater Treatment Plant in Wuxi with a final design capacity of 20×10^4m^3/d. The firststage project with a capacity of 5 ×10^4m^3/d has been constructed and the second-stage extension project is of 5 ×10^4m^3/d. The deodorizing device is added. The process flow, design parameters, equipment allocation were introduced, and the design features and the application of new equipment were summarized.
出处
《中国给水排水》
CAS
CSCD
北大核心
2007年第4期43-47,共5页
China Water & Wastewater
关键词
污水处理厂
ORBAL氧化沟
厌氧水解
除臭装置
wastewater treatment plant
Orbal oxidation ditch
anaerobic hydrolysis
deodorizing device