邹县四期2×1000MW超超临界机组高加选型探讨 被引量:3

Discussion on the Scheme of High-pressure Heaters of 2×1000MW Ultra-Supercritical Units in Zouxian Power Plant
下载PDF
导出
摘要 结合华电国际邹县发电厂四期工程2×1000MW超超临界机组在设计及设备选型阶段的工程实践,对选用双列高加布置方案或单列高加布置方案的利弊进行了详细的论述,所述内容应对以后的超超临界机组的系统设计有所借鉴作用。 With the engineering practice of 2 × 1000MW ultra - supercritical unit of Stage 4 Project of HDPI Zouxian Power Plant at the period of equipment designing and selecting, the advantages and disadvantages of two - row arrangement scheme and single - row arrangement scheme of the high - pressure heaters are discussed in detail. All the illustration in this paper probably can be used for reference of the later system design of ultra - Supercritical unit.
作者 王泳涛
出处 《山东电力技术》 2007年第1期30-33,共4页 Shandong Electric Power
关键词 超超临界 1000MW 高加 设计 ultra- supercritical unit 1000MW higher pressure heater design
  • 相关文献

参考文献3

  • 1高压加热器技术条件[S].JB/T8190—1999
  • 2高压加热器制造技术条件[S].JB/T3343-1993
  • 3杨世铭.传热学(第二版)[M].北京:高等教育出版社,1987..

共引文献25

同被引文献6

引证文献3

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部