富水条件下盖挖逆作地铁车站中间柱施工技术 被引量:4

Fabricating the Intermediate Column of a Subway Station Constructed by Top-down Covered Excavation in Water-soaked Ground
下载PDF
导出
摘要 论述盖挖逆作法施工地铁车站,中间柱施工是一道十分关键的工序,一旦柱位出现偏差,很难采取补救措施。介绍南京地铁新街口站采用的一整套完整的施工工法,即将可倒用的钢套管作为隔水工具,形成地下操作空间,采用具有自动导向的定位器,精确完成钢管柱安装及杯口砼的浇注。 In the top-down covered excavation for building a subway station, the intermediate column fabrication is the extremely essential working procedure. Once deviation of the column Position occurs, it is very difficult to adopt remedial measures. This article introduces the complete construction procedure adopted in Nanjing Xinjiekou Subway Station. A steel thimble was adopted to separate the water and form the underground operation space. A pre-computed course locator was employed to complete the steel-pipe column installation and the concrete fabrication through the cup mouth.
出处 《都市快轨交通》 2007年第1期64-67,71,共5页 Urban Rapid Rail Transit
关键词 富水条件 盖挖逆作 地铁车站 中间柱 施工技术 water-soaked top-down covered excavation subway station intermediate column construction technology
  • 相关文献

参考文献2

二级参考文献3

共引文献5

同被引文献14

引证文献4

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部