水南特大桥98m长挖孔桩施工 被引量:1

Construction of 98m Long Dug Piles of Shuinan Bridge
下载PDF
导出
摘要 湖北沪蓉西高速公路水南特大桥右幅8号墩桩长98 m,所处地址条件复杂,岩石破碎、岩溶尤为强烈,发育成古岩漏斗。根据实际情况采用挖孔桩施工,介绍施工方法及各项特殊措施,为类似工程提供参考。 The piles of Pier No. 8 of the right deck of Shuinan Bridge on the west section of Shanghai-Chengdu Expressway in Hubei Province are 98 m long. The geologic conditions at the site where the piles are located are complicated, that is, the rock foundation there is rupture, the karst geology is particularly prominent and has grown into fossil rock hopper and in accordance with the conditions at the site, the piles were constructed by digging method. In this paper, the construction methods and various special measures adopted in the construction of the piles are presented. It is expected that the presentations in the paper may serve as reference to the construction of similar works.
作者 贺建端
机构地区 中铁五局二公司
出处 《桥梁建设》 EI CSCD 北大核心 2007年第1期64-66,69,共4页 Bridge Construction
关键词 挖孔桩 护壁 桥梁施工 dug pile lagging bridge construction
  • 相关文献

参考文献2

  • 1交通部第一公路工程总公司.公路施工手册桥涵(上册)[M].北京:人民交通出版社,1999.
  • 2铁道部第二勘测设计院.铁路工程设计技术手册隧道[M].北京:中国铁道出版社,1999.

共引文献1

同被引文献3

  • 1裘伯永 熊振南 林丕文.桥墩扩大基础优化设计.铁道科学与工程学报,1983,(01).
  • 2挖孔桩施工技术.铁道标准设计,1973,(04).
  • 3战启芳.桩基础高墩优化设计[J].铁道标准设计,2000,20(5):29-31. 被引量:4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部