摘要 提出了在有排序约束和无排序约束两种情况下的流水线节拍设计方案,能有效解决流水线负荷平衡问题.该设计方案通过优化选取工作节点和工作节拍、有效组合任务元素、降低工作节点间等待时间等有效措施,来提高设备利用率、实现流水线负荷的平衡,进而达到提高流水线生产产量的目的. Theory of assembly line cycle time design is proposed in the condition of order restraining and disorder restraining. It can be used to solve the problem of load balance among assembly lines. By choosing cycle time and work node rationally, combining assignment factors efficiently, reducing waiting time between nodes as well as adopting other useful measures, equipment utilization and balance of assembly line load are improved. Thus the goal of increasing outputs can be reached.
出处 《武汉理工大学学报(交通科学与工程版)》 2007年第1期183-186,共4页 Journal of Wuhan University of Technology(Transportation Science & Engineering)
关键词 流水线 节拍 负荷平衡 assembly line cycle time balance of load
  • 相关文献

参考文献2

二级参考文献6

共引文献16

同被引文献31

引证文献7

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部