摘要:莱钢炼铁厂2^#750m^3高炉采用降料线停炉,整个过程实现了安全、顺利、快速停炉。残铁口位置选定准确,残铁基本放净,为高炉大修创造了良好条件。
The Ironworks, Laigang, adopted the reduced-stockline to shut down for its 750-m^3 blast furnace #2. The whole process was safe, smooth and fast, with the position of the outlet for remaining iron chosen accurate, and remaining iron basically cleaned, creating satisfactory conditions for the overhaul of the blast furnace.