摘要
研究应用灰色系统理论,结合矿震极值数据,建立GM(1,1)预测模型,在此基础上进一步应用残差修正主模型,由构造出的新模型推测出未来的矿震极值。预测结果有较高的精度,为矿震极值预测提供一种可行性方法。
This paper attempts to apply grey system theory to establishing GM (1, 1 ) of grey prediction model, and apply further residual to revising main model, then constructs a new prediction model which is used to predict the extreme data of mine tremor further. Because of high precision of prediction result, grey system theory has certain feasibility in predicting the extreme data of mine tremor.
出处
《测绘工程》
CSCD
2007年第1期16-18,共3页
Engineering of Surveying and Mapping
基金
地球空间环境与大地测量教育部重点实验室开放基金(905152533-05-04)
关键词
矿震
灰色系统理论
灰色模型
预测
mine tremor
grey system theory
grey model (GM)
prediction