摘要
以呼玛县团结水电站工程为实例,介绍了浇筑沥青混凝土心墙的施工工艺和质量控制要点。
This paper introduces the construction technology of casting bitumen concrete core wall and the main point of quality control according to the real construction example at Huma Tuanjie Hydropower Station.
出处
《黑龙江水专学报》
2006年第3期139-140,共2页
Journal of Heilongjiang Hydraulic Engineering College
关键词
沥青混凝土
浇筑
温度
心墙
bitumen concrete
casting
temperature
core wall