摘要
应用合共公路桥的概化模型试验研究了斜交桥的阻水特性、壅水高度.通过对桥位附近的实测水位与水流三维流速分布及紊动特性的比较分析,改进了计算斜交桥壅水的方法,并给出阻水宽度折算系数.经验证,斜交桥修正计算流速和壅水值与概化模型试验的实测值较为吻合.
The block water characteristics and backwater height of skew bridges are experimentally studied with the sketch model of the Hegong bridge of a speedway. By comparing and analyzing the measured water level, threedimensional velocity distribution and turbulent character around the bridge location, the calculation method for the backwater of skew bridges is improved and the reduction factor of block water width is presented. Verification results show that the corrected velocity and backwater height agree well with the measured values in the sketch model test.
出处
《水利水运工程学报》
CSCD
北大核心
2007年第1期41-46,共6页
Hydro-Science and Engineering
关键词
脉动强度
壅水高度
概化模型试验
宽度折算系数
斜交桥
fluctuation strength
backwater height
sketch model test
reduction factor of width
skew bridge