摘要
针对宝鸡第二发电公司零排放系统投产阶段反渗透入水COD_(Mn)超标的问题,对反渗透系统影响COD_(Mn)的因素进行了分析和调整试验,找出了导致COD_(Mn)超标的原因;通过采取相应的措施,解决了反渗透系统投产阶段反渗透进水COD_(Mn)超标的问题。
Directing against the problem of exceeding set standard in entering water for reverse osmosis in Baoji No.2 Power Generation Co., Ltd., analysis and experiment for influencing factors of reverse osmosis system upon the CODMn have been carried out, finding out the causes leading to CODMn exceeding set standard. Through corresponding measurements, the problem of CODMn surpassing set standard in entering water for reverse osmosis in stage of putting into operation of the reverse osmosis system has been solved.
出处
《陕西电力》
2007年第2期59-61,共3页
Shanxi Electric Power
关键词
反渗透
CODMN
超标
原因分析
处理措施
reverse osmosis
the CODMn surpassing set standard
reason analysis
treatment