摘要
通过用邓肯~张E~B模型,对岗曲河面板堆石坝在竣工期、蓄水期和泄水期进行了非线性有限元仿真计算,特别考虑了坝上溢洪道在泄水期,泄水水流对坝体应力和变形的影响,研究了大坝在三种工况下的应力变形特点及分布规律。计算结果分析表明,坝体竣工期、蓄水期的应力应变符合一般规律,泄水期的应力与竣工期、蓄水期相比有所减小,变形相差不是很大。
Stress and deformation of Gangquhe CFRD was calculated with the nonlinear finite element method based on the Duncan-Chang E-B model in the completion storage and discharging periods. The results indicate that stress and deformation of the dam in the discharging period is not larger than another.
作者
苏永江
路文波
胡再强
SU Yong-jiang LU Wen-bo , HU Zai-qiang (1. Xi'an University of Technology, Xi'an 710048, China2. Xijiang Kashi Water Comservancy Bureau, Xijiang Kashi 844000, China)
出处
《西北水力发电》
2007年第1期41-44,共4页
Journal of Northwest Hydroelectric Power