期刊文献+

洛河电厂废水水质水量测试及废水“零排放”试验研究 被引量:1

Measurement and test of waste water quality and flow rate and "Zero Discharge" in Luohe power plant
下载PDF
导出
摘要 调查研究了洛河电厂取用排水水量情况,并对厂内、厂外生活废水、工业废水的水质进行了取样分析,同时对用电厂粉煤灰处理废水的水质变化情况进行了试验。文中提出了用电厂生活废水、工业废水冲灰,以实现对生活废水、工业废水的处理,简化了电厂实现废水"零排放"系统及工程投资,具有较大的环境效益和社会效益。 This article investigated and measured the situation of intake and draining water flow rate in Luohe power plant, and carried on the sample analysis on domestic waste water and industrial waste water inside and outside the factory, simultaneously to carry on the experiment on fly ash processing waste water quality and its development situation .The article proposed with the domestic and industrial waste water flush the ash, then realize to process the domestic and the industrial waste water, simplified waste water "zero to discharge" system and the project investments, having greater environment benefit and the social efficiency.
出处 《安徽电力》 2007年第1期5-9,共5页 Anhui Electric Power
关键词 发电厂 工业废水 生活废水 粉煤灰 处理 零排放 power plant, industrial waste water, domestic waste water, fly ash , process zero dis charge
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部