摘要
介绍了水钢15MW蒸汽发电机组的总图选址的设计原则和设计方案,通过对三个方案的比较,得出第三个方案是最佳选择。
Well general layout to choose an address work, General layout to choose an adress for 15000kw steam generator set in Shuicheng iron & SteeL Co.Produce for the factory of lay good foundation smoothly progress.