摘要
缅甸卑谬依诺瓦底江大桥的上弦杆为钢箱杆件。本文介绍了该钢箱杆件的制造工艺及不需焊后矫正就能达到规范要求的变形控制措施。
Top chords of Pyay Irrawaddy River Bridge in Myanmar are of steel box members. Fabrication technology and deformation control measures, which can meet requirements of specifications without need of corrections after welding, for the steel box members are expounded.
出处
《桥梁建设》
EI
CSCD
北大核心
1996年第3期74-76,共3页
Bridge Construction
关键词
依诺瓦底江大桥
上弦杆
制造
桥梁
变形控制
Irrawaddy river bridge, top chord,fabrication, deformation control