期刊文献+

葡萄牙塔古斯大桥改扩建工程 被引量:3

Retrofitting and Widening of Tagus Bridge in Portugal
下载PDF
导出
摘要 为应对持续增长的交通量,葡萄牙工程师们从1996年开始,对1966年建成的塔古斯大桥进行了彻底的翻修和扩建,在不中断交通条件下,历时3年,把原先的4车道公路桥变成6车道公铁两用桥,加装了2条主缆,更换了下层桁架,加铺了铁轨,拓宽了公路桥面,并重新命名为4月25日桥。4月25日桥的改扩建措施为今后的桥梁维护改造提供了新思路。 To cope with the continuing growth of traffic flow, the Portuguese engineers, starting from the year 1996, have implemented thorough retrofitting and widening of the Tagus Bridge in Portugal that was first open to traffic in 1966. It took three years to complete the retrofitting of the bridge without interruption of traffic and the existing 4-lane roadway bridge was retrofitted into a new bridge of 6-lane roadways and railways, on which two main cables were added, the lower deck steel trusses were replaced, the railway tracks were installed, the roadway deck was widened, and the new bridge was again named as the April 25 Bridge. The retrofitting and widening measures taken for the April 25 Bridge provide brand new ideas for the maintenance and retrofitting of bridges of similar kind in the future.
出处 《世界桥梁》 北大核心 2007年第1期5-8,共4页 World Bridges
关键词 公铁两用桥 悬索桥 桥梁改造 rail-cure-road bridge suspension bridge bridge retrofitting
  • 相关文献

同被引文献13

引证文献3

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部