摘要
大跨度钢架横梁在高空与钢柱对接焊,利用“马鞍”进行刚性固定,边柱垂直度向外偏移,按工艺要求组织施工,为今后类似工程提供参考。
According to process requirements, large - span steel beam is overhead welded with steel pillar. This will provide some reference for similar project.
出处
《冶金标准化与质量》
2007年第1期47-49,共3页
Metallurgical Standardization & Quality
关键词
大跨度钢架梁
高空焊接
工艺要求
large - span steel beam overhead welding
process requirement