摘要
评述辽河化肥厂配套公用工程设施──美国玛利600型7格塔冷却塔修复与改造项目的技术经济分析。叙述了该冷却塔现状,并据此拟定出的经济而实效的分期改造方案。
The technical and economic evaluation of repait and modification project for Marley 600 7-cell cooling tower,a utility completed with Kellogg large ammonia plant by Liaohe Chemical Fertilizer Plant in 1973,is reviewed in this paper.An economic and effective,modernizing scheme planned and prepared for existing service,conditions of cooling tower are also disc ussed in details.
出处
《大氮肥》
1996年第3期173-175,182,共4页
Large Scale Nitrogenous Fertilizer Industry
关键词
冷却塔
技术经济分析
技术改造
维修
合成氨生产
cooling tower,repair and modification,framework,fills,eliminators,windage losses