摘要
结合斯那姆氨气提工艺的工艺设计与实际操作,对其操作弹性进行了较详细地分析,说明斯那姆工艺操作简便灵活,并对其操作中存在的一些问题进行了讨论。
Based on the process design and actual operation of the Snamprogetti ammonia stripping process,this paper analyzes and evaluates in detail the operation flexibility of the process,showing that the operation of Snamprogretti is simple and flexible,and discusses some problems existing in the operation.
出处
《大氮肥》
1996年第4期293-296,共4页
Large Scale Nitrogenous Fertilizer Industry
关键词
氨气提
工艺
操作弹性
工艺设计
尿素
Snamprogetti ammonia stripping process,operation flexibility,process design