通过对大唐乌沙山电厂(4×600 MW)1号机组进行制粉系统调整、一次风调平、二次风风量标定、燃烧器调整、烟气挡板调整及冷态动力场试验等,消除了锅炉在燃烧、配风等方面存在的一些问题,使设备性能水平改善,状态良好。
Through adjustment of the coal pulverizing system, primary air averaging, secondary air flow calibration, adjustment of burners, adjustment of flue gas damper, and cold - state dynamic field test etc. for unit no. 1 in Datang Wushashan power plant, elimination of problems in aspects of combustion and air distribution etc. of the boiler has been carried out, obtaining satisfactory result.
出处
《热力发电》
CAS
北大核心
2007年第2期34-36,51,共4页
Thermal Power Generation
关键词
600
MW机组
超临界直流炉
制粉系统
燃烧
配风
600 MW unit
supercritical once-through boiler
coal pulverizing system
combustion
air distribution