摘要
青藏铁路Ⅱ期110 kV输电线路地处青藏高原腹地,属多年冻土地区,自然环境恶劣,是一项挑战性工程。文章分析了青藏高原多年冻土条件下混凝土的特点,提出了提高基础混凝土耐久性的技术对策,最后对该施工技术的应用效果进行了分析评价。
The second phase of 110kV transmission line of Qing- Tibet railway pass through hinterland of perennial frozen ground of the highland, thus it's a challenging engineering because of execrable environments. The paper analyzes concrete character under the environment of perennial frozen ground, and proposes technical countermeasures of improving durability of basiv concrete; finally, it makes analysis and evaluation on the application effect of the constructing technology.
出处
《青海电力》
2007年第1期20-23,39,共5页
Qinghai Electric Power
关键词
青藏铁路
输变电工程
多年冻土
混凝土
施工技术
Qing - Tibet railway
transmission and distribution engineering
perenriial frozen ground
constructing technology