摘要
介绍了地铁自动售检票系统的组成,阐述了各施工阶段所采用的施工方法、程序及注意事项。
This paper introduces the components of subway's automatic ticket issuing and checking system, and expounds the construction methods and procedures adopted in each stage of tile construction of subway's automatic ticket issuing and checking system, and puts forward the matters needing attention in each stage of the construction of subway' s automatic ticket issuing and checking system.
出处
《科技情报开发与经济》
2007年第6期285-287,共3页
Sci-Tech Information Development & Economy
关键词
地铁自动售检票系统
施工方法
施工程序
subway' s automatic ticket issuing and 'checking system
construction method
construction procedure