摘要
水电站的设计优化和机电设备的选型,甚至选择设备生产厂家等工作与业主的管理思路和设备档次定位有着密切的关系,作为一个无人值班,少人值守和建管合一的公司,平班公司更注重设备的免维护、自动控制可靠,避免出现基建期后马上进行大量的技改工作。为此,公司重点抓了设计优化、设备选型、采购和出厂验收等工作。电站投产以来,机组设备状况良好,已安全生产700多天,实现了新建电厂“即投产、即稳定、即盈利”的目标。
The optimized design of hydropower station, the selection of electromechanical equipment, and the selection of equipment manufacturer have close relation with the owner's management ideas and his orientation of equipment's class. As an unattended company featuring in few people on duty and combination of construction and management, Pingban Hydropower Developing Co., Ltd attaches greater importance to the reliability of maintenance-free automatic control and to the avoidance of substantial technology modification works after construction. To this end, the company emphasizes on design optimization as well as selection, procurement and ex-factory acceptance of equipment. The units have being working well and safely for more than 700 days ever since the station was put into operation, achieving the goal of yielding benefits with stableness right after being put into operation.
出处
《红水河》
2007年第1期23-26,共4页
Hongshui River
关键词
设计优化
电气设备
选型
平班水电站
design optimization
selection of electrical equipment
Pingban Hydmpower Station