摘要
平班水电站水工建筑物设计中对左岸重力坝、溢流坝、发电厂房、开关站、右岸重力坝等部位进行优化,这些设计优化均在施工中得以实施,节省了工程投资并加快了施工进度,为电站首台机组提前并网发电提供了有力的保障,取得了良好的经济效益和社会效益。。
The designs of gravity darns on left and right banks, spillway dam, power house, and switchyard have been optimized in the design of hydraulic structures for Pingban Hydropower Station. As these designs were enforced in construction, the project investment was reduced and the construction process was accelerated, which not only ensured that the first unit of the station could be connected to the power grid to generate electric power ahead of schedule but also produced good economic and social benefits.
出处
《红水河》
2007年第1期37-42,52,共7页
Hongshui River
关键词
设计优化
水工建筑物
节省投资
施工进度
平班水电站
design optimization
hydraulic structure
investment reduction
construction progress
Pingban Hydropower Station