摘要
介绍韶钢某露天栈桥人工挖孔桩基础严重施工质量事故、事故的原因及加固处理方法,可供同类型结构设计、施工时参考.
The details of a quality accident occurring with a manually dug pile foundation for an outdoor trestle are described, the cause of the accident revealed, and the amendments to the defected foundation proposed in the paper. The case could be referred to dealing with similar engineering projects.
出处
《南方金属》
CAS
2007年第2期47-49,共3页
Southern Metals
关键词
人工挖孔桩基础
施工质量事故
处理
manually dug pile foundation
construction quality accident
treatment