厦门港东渡港区19^#泊位的改建设计及施工综述

Reconstruction Design and Construction of Xiamen Port Dongdu Port Area Berth 19^#
下载PDF
导出
摘要 由于厦门城市规划和港口功能区划调整,需将厦门港东渡港区19#泊位的煤码头改建为5万吨级的多用途码头(按靠泊10万吨级集装箱船预留),拟建的码头结构型式为沉箱重力式。为此,需将旧的高桩梁板码头拆除。介绍高桩梁板码头拆除方案的设计及施工,重点分析岩质海岸地质条件下预制桩的拆除方案。 According to Xiamen municipal master plan and port functional zone's adjustment, the coal terminal of Xiamen Port Dongdu Port Area Berth 19^# is required to be reconstructed to a 50 000 dwt multi-purpose wharf (prepared for berthing 100 000 dwt container ships), which adopts caisson-type gravity structure. So, the existed high-piled slab & beam wharf shall be demolished. This paper describes the design and construction of the demolishing scheme of the high-piled wharf, and analyzes mainly the demolishing scheme of precast piles under rocky coast.
作者 肖土生
出处 《水运工程》 北大核心 2007年第2期85-88,共4页 Port & Waterway Engineering
关键词 高桩码头 预应力混凝土实心方桩 拆除 改建 重力式码头 high piled wharf prestressed concrete solid pile removal reconstruction gravity wharf
  • 相关文献

参考文献4

  • 1中交第四航务工程勘察设计院.厦门港东渡港区19^#泊位改建工程初步设计报告[R].广州:中交第四航务工程勘察设计院,2004..
  • 2中交第四航务工程勘察设计院.厦门港东渡港区19^#泊位改建工程地质勘察报告[R].广州:中交第四航务工程勘察设计院,2004..
  • 3中交第三航务工程局第六工程公司.厦门东渡港二期石湖山煤码头工程竣工图[R].厦门:中交第三航务工程局第六工程公司,1993.
  • 4中交第四航务工程勘察设计院.厦门港东渡港区19^#泊位改建工程施工图[R].广州:中交第四航务工程勘察设计院,2004..

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部