摘要
结合汉中某实验楼工程实例,介绍了人工挖孔灌注桩在复杂地质条件下的施工工艺、施工技术和安全措施,并对轻型动力触探与低应变动力检测结果进行了分析,从而为人工挖孔灌注桩在陕南地区的推广提供了理论依据。
Combined with one laboratory building works in Hanzhong as example construction technology and safety measuresof manual holing pouring pile under complex geological conditions are introduced. Results of light dynamic penetration test and dynamic sounding and low strain dynamic test are analyzed in order to provide references for the application of manual holing pouring pile in the south of Shanxi Province.
出处
《山西建筑》
2007年第9期120-121,共2页
Shanxi Architecture
关键词
施工技术
人工挖孔灌注桩
低应变
施工措施
construction technology, manual holing pouring pile, low strain, construction measure