结合皂市水利枢纽大坝工程变更处理的实践,叙述了如何按照合同原则和变更项目处理程序,妥善处理工程变更,协调好发包人、承包人之间的关系,达到有效控制工程投资,促进工程建设资金的良性循环的目的。
Taking the against contractor changing in Zaoshi Project dam engineering as an example, the ways to deal with engineering changes, coordinate the relationship between both sides of a contract sticking to contract principles and procedure of changing items, to keep project investment under control and engineering fund in a virtuous circle.