摘要
伊朗塔里干水利枢纽地下厂房工程交通竖井多井滑模设计及施工技术具有许多创新点和独特性,国内外尚属少见,值得同类工程借鉴。
There has a great deal of innovation and uniqueness in the design of multi - shaft slipforms for access shaft of underground powerhouse and its construction technique for Taleghan HHP Project. That is rare both at home and abroad, and is good for reference of similar projects.
出处
《西北水电》
2007年第1期43-47,共5页
Northwest Hydropower
关键词
伊朗塔里干水利枢纽工程
地下厂房
交通竖井
施工布置
多井滑模设计
Taleghan HHP Project
access shaft of underground powerhouse
construction arrangement
multi - shaft slipform design