期刊文献+

浅析工程量清单计价模式下的“无标底”招投标

Simple Analysis of Competitive Bidding and Bidding "Without Quotation Drawn up Alone" in Mode of Quotation for Bill of Engineering Quantities
下载PDF
导出
摘要 推行工程量清单计价模式下的无标底招投标是我国工程招投标体制改革发展的方向和趋势。文章阐述了推行工程量清单计价模式下无标底招投标是市场经济必然要求,分析了无标底招投标的优点,以及在我国全面实行无标底招投标应具备的条件,并总结了实行无标底招投标的意义。 Pursuing the competitive bidding and bidding " Without Quotation Drawn up Alone" in mode of quotation for bill of engineering quantities is a direction and trend of developing the reformation of system for competitive bidding and bidding is an inexorable requirenments of market economy, analyzes their merits as well as the conditions which should have in the cases of overall carrying out this competitive bidding and bidding, and sums up significance to put into effect it.
作者 王琦 高新
出处 《北方交通》 2007年第3期116-118,共3页 Northern Communications
关键词 工程建设 工程量清单 无标底 招投标 Engineering building Bill of engineering quantities Without quotation drawn up alone Competitive bidding and bidding
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部