BOT项目特许权协议中应注意的问题 被引量:2

Problems that should be Paid Attention to in Concession Agreement of BOT Project
原文传递
导出
摘要 BOT项目的特许权协议是整个项目合同结构中的核心。特许权协议中对于项目权利义务的分配,将影响着后续需签订的合同。特许权期限、项目扩建与改建、项目的移交和不可抗力等问题,尤其需要更多的关注。处理好这些问题,将有助于项目顺利地实施。 The concession agreement of BOT project is the core of the entire contract structure of the project. Parties' rights and obligations, distributed in the concession agreement,will have an influence on the contracts that will be signed later. We should pay more attention to the terms of concession, the expansion and rebuilding work of the project, the handover of the project and the force majeure ect. If these are well tackled, it will make the project more successfully carried out.
作者 路晶晶 成虎
出处 《建筑经济》 北大核心 2007年第4期63-65,共3页 Construction Economy
关键词 BOT项目 特许权协议 合同 BOT project concession agreement contract
  • 相关文献

参考文献3

二级参考文献7

共引文献6

同被引文献14

  • 1王娅,宇德明.决策BOT项目特许权期限的模型[J].基建优化,2004,25(5):12-15. 被引量:3
  • 2何寿奎,傅鸿源.基于另投资假设的公路基础设施BOT项目特许期决策探讨[J].中南公路工程,2007,32(2):186-188. 被引量:1
  • 3赵立力,谭德庆.BOT项目特许权期和投资规模决策分析[J].运筹与管理,2007,16(4):39-44. 被引量:13
  • 4ZhangWR, WangSQ, TiongRLK, etal. Risk management of Shanghai' s private financed Yan' an donglu tunnels[J]. Journal of Engineering, Construction and Architecture Management. 1998, 5 (4).
  • 5Sudong Ye. The effect of concession period design on completion risk management of BOT projects[J] Construction Management & Economics. Jul/Aug2003, (4).
  • 6Shen L Y, Li H, Li Q M. Alternative concession model for build operate transfer contract projects[J] . Journal of Construction Engineering and Management. 2002, 128(4).
  • 7Shen L Y, Wu Y Z. Risk concession model for build operate transfer contract projects [J ] . Journal of Construction Engineering ang Management. 2005, 131(2).
  • 8Ye S D, Tiong R L K. The effect of concession period design on completion risk management of BOT projects [J]. Co nst ruction Management and Economics. 2003, 21.
  • 9Shash A A. Factors considered in tendering decisions by top U K contractors[J]. Journal of Construction Management and Economics . 1993, 11.
  • 10Nisangul C. Private participation in infrastructure: a risk analysis of long term eontraets in power seetor[D]. George Mason University. 2002.

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部