摘要
就贵溪冶炼厂三期改造后闪速炉烟气收尘系统出现的问题进行了分析,并对提高收尘效率等一系列技术改造进行了总结。
The problem about dust collecting in Guixi Smelter's Flash Smelt Furnace off-gas system after the "Third Step Project" is analyzed, and a series of technical improvements for increasing the efficiency of dust collecting are also summarized.
出处
《有色金属(冶炼部分)》
CAS
北大核心
2007年第2期19-21,共3页
Nonferrous Metals(Extractive Metallurgy)
关键词
闪速炉
烟气
收尘
改造
废酸
Flash Smelt Furnace
Off-gas
Dust collecting
Improvement
Waste acid