摘要
针对采用冲击压实技术可以缩短工期,但直接工程成本较高的实际,提出了2种采用冲压技术的社会经济效益比较方法,并用实例进行了验证。结果表明,采用冲击压实技术的社会经济效益大于普通压实技术的社会经济效益。
With regard to the situation of reduction of construction period and high direct engineering cost by use of the compaction technology,two analytic methods are put forward for comparison of social and economic benefits.Cases are employed for their verification.The results show that the compaction technology is feasible from the aspects of social and economic benefits.
出处
《水利经济》
2007年第2期24-27,共4页
Journal of Economics of Water Resources
关键词
冲击压实技术
社会经济效益
分析方法
compaction technology
society
economic benefit
analytic method