3Powell, MJD.A fast algorithm for nonlinearly constrained optimization calculation[J].Lecture Notes in Mathematics, 1978, 630:144-157.
4蔡文.物元模型及应用[M].北京:科学技术文献出版社,1994..
5MOORE R. Establishing an inventory management program [J]. Plant Engineer, 1996 (3) : 113 -116.
6HANEVELD W K, TEUNTER R H. Optimal provisioning strategies for slow moving spare parts with small lead times [J]. Journal of Operational Research Society, 1997 (48): 184-194.
7FROOT B. On the implementation of a control - based forecasting system for aircraft spare parts procurement [J]. IIE Transaction, 1995 (27) : 210-216.
8PFHL HANS - CHRISTIAN, Ester B. Benchmarking for spare parts logistics [J]. Benchmarking: An International Journal, 1999, 6: 22 - 39.
9FORTUNE L, MARTIN H. Control of service parts [J]. International Journal of Operations & Production Management, 1999, 19 (9) : 950 - 971.