以某桩基工程事故为例,分析了软土地基上钢筋混凝土预制桩沉桩施工中造成桩位偏移和断桩的原因,并提出为避免此类事故发生可采取的技术与管理措施。
This paper analyses the reasons for incurring the deviation and break of piles in the driving construction of prefabricated reinforced concrete piles in soft ground, giving the example of an accident of pile foundation. And then,it presents the technological and managerial measures avoid the occurrence of similar accidents.
出处
《港工技术》
1996年第4期49-50,F003,共3页
Port Engineering Technology
关键词
软土地基
桩基础
桩位偏移
断桩
事故分析
soft ground,pile foundation,deviation of pile,break of pile