摘要 可持续发展的输电系统规划对传统的规划问题提出了新的挑战,而模糊机会约束规划是解决包含随机模糊性的不确定因素优化方法,为输电系统规划提供了新的解决途径,为此将这一方法引入到输电系统规划研究。通过对规划中不确定性问题的分析,建立了规划的数学模型,将模糊随机模拟和遗传算法相结合,实现了解决这类规划的新方法。最后,用算例证明了方法的可行性。 Compared with the traditional transmission system planning, the transmission system planning based on the sustainable development is more complicated which need to solve more problems with uncertain factors. The traditional transmission system planning schemes have heuristic methods and mathematic planning which get solutions under the stable systems and building mathematic model during the planning period time. The transmission system planning based on the sustainable development puts forward a new challenge to planning problems. The fuzzy chance constrained programming is a novel special stochastic optimization method to solve the problems that include uncertain factors and stochastic fuzzy factors. It provides a new solution to the transmission system planning. This paper uses this method to study the transmission system planning. A model has been established through researching on these uncertain factors. A novel method is applied in this kind of planning, through combining the genetic algorithm with stochastic simulation. At last an example is given to prove the feasibility of the developed model and method.
出处 《高电压技术》 EI CAS CSCD 北大核心 2007年第3期67-70,共4页 High Voltage Engineering
关键词 模糊机会约束规划 不确定性 遗传算法 可持续发展 输电系统规划 数学模型 fuzzy chance constrained programming uncertainty genetic algorithm sustainable development the transmission system planning mathematic model
  • 相关文献

参考文献13

二级参考文献49

共引文献534

同被引文献41

引证文献3

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部