摘要
鉴于钻孔灌注桩施工的隐蔽性及工序的不可逆转性特点,阐述了施工前期、施工过程以及施工验收时期的监理工作控制要点,强调了灌注桩施工的事前、事中控制的重要性,以保证钻孔灌注桩的施工质量。
In light of the characteristics of bored cast-in-situ pile construction as invisibility and irreversible working procedure, the author illustrates supervision essentials at the stages of pre-eonstruction, construction and construction acceptance, and emphasizes the significance of prior control of cast-in-sire pile construction and the control during the construcion, in order to ensure eonstruction quality of bored cast-in-sire pile.
出处
《山西建筑》
2007年第11期142-143,共2页
Shanxi Architecture
关键词
灌注桩
现场施工
质量监控
施工验收
cast-in-situ pile, field eonstruction, quality supervision, eonstruction acceptance