摘要 黄壁庄水库除险加固工程副坝混凝土防渗墙施工过程中,发生过7次规模巨大的塌坑事件,为此,对塌坑机理进行了定性分析,总结得出基岩中存在溶蚀性等裂隙通道、泥浆漏失及存在易失稳砂层是发生塌坑的3个基本要素,砂层漏失形成塌落空洞(渐进发展过程)、塌落空洞致使地面塌陷(短时间完成)是塌坑形成的2个基本环节。采用力学解析方法,对砂层漏失形成塌落空洞的机理进行了分析,并对砂层塌落的渐进发展过程进行了讨论。采用大变形数值分析方法,通过在砂层中设置塌落空洞,模拟塌落空洞导致地面塌陷的过程。 During concrete cutoff wall construction of Huangbizhuang reservoir secondary dam reinforcement project, seven large-scale ground collapses occurred. This kind of collapse, rarely happened all over the world, is quite different from normal slot collapses during concrete cutoff wall construction, typically caused by mass loss of partial strata material. By investigating the features of ground collapses, the paper summarizes three elementary factors and two elementary procedures of ground collapses formation. By employing mechanical analytical methods, the mechanism is analyzed that a caving hole would be formed due to the drain of sands in sand-bed. The process of sand-bed progressively caving is discussed also. By means of large deformation numerical method, the process of ground collapse caused by caving hole in sand-bed, which is set before computation, can be simulated.
出处 《长江科学院院报》 CSCD 北大核心 2007年第2期39-42,54,共5页 Journal of Changjiang River Scientific Research Institute
关键词 黄壁庄水库 混凝土防渗墙 塌陷机理 地面塌陷 Huangbizhuang reservoir concrete cutoff wall collapse mechanism ground collapse
  • 相关文献

参考文献1

  • 1崔洪敬,王伟.黄壁庄水库除险加固副坝混凝土防渗墙Ⅳ标段单位工程塌坑处理专题报告[R].天津:河北省黄壁庄水库除险加固工程建设局,2004.

同被引文献7

引证文献1

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部