6Boumazel.C.and Jcanson.B:”A Correlation Method for Predicting Water Coning Times”.Paper 3628 presented at the1971SPEAnnual Technical Conference and Exhibition.New Orleans.
7Q.Jiang,R.M.Butler.E xperimental and Numerical Modeling of Bottom Water Coning to a Horizontal Well[J].The Journal of Canadian Petroleum Technology.1998,37(10):82-91.
8Permadi P,Wibowo W,Erickson J.Optimum Stinger Length for a Horizontal Well in a Bottom Water Drive Reservoir.Petroleum Society,1998.
9Permadi P.Water Cresting And Oil Recovery by Horizontal W e l l s i n t h e P r e s e n c e o f I m p e r m e a b l e Streaks.SPE/DOE35440,1996:381-391.
10Permadi P,Lee R L,Kartoatmodjo R.S.T.Behavior of water crestingunderhorizontalwell[J].SPE30374,1995.