期刊文献+

百色水利枢纽地下厂房尾水洞系统施工综述

A Summary of the Construction of the Underground Powerhouse Tailrace Tunnel System of the Baise Hydropower Project
下载PDF
导出
摘要 水电十四局在百色水利枢纽工程施工中集思广益、挖掘潜力、优化设计、精心施工,逐一克服洞室结构多样、形体变化复杂、洞室间隔强制约、施工工序多干扰、环境场地受限制等诸多困难,胜利地完成了施工任务,得到了两院院士潘家铮的赞叹。 The 14th Construction Bureau of China Water Conservancy and Hydropower has successfully carried out its tasks of constructing the underground powerhouse tailrace tunnel system of the Baise Hydropower Project and has highly been appraised by Mr. Pan Jiazbeng, academician of the two academies by drawing on collective wisdom and absorbing all useful ideas, tapping the latent power and being meticulous in construction after overcoming such difficulties one after another as structural diversification of underground caverns, complication of shape variation, interaction of cavern spachags, more construction procedures and restriction of site environment.
作者 郭炳新
出处 《云南水力发电》 2007年第2期1-5,10,共6页 Yunnan Water Power
关键词 百色水利枢纽 施工支洞 岩塞 尾水洞室 中空白进式锚杆 管棚施工 Baise hydropower project construction adit rock plug tailrace chamber intervening boring self- propelling anchor bolt construction of pipe shed
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部