摘要
结合实践经验及对《建设工程量清单计价规范》的理解,介绍了工程量清单报价的各组成部分,并对工程量清单报价的最终确定进行了分析探讨,从而达到合理确定施工成本,最终确定投标报价的目的。
Combined with practical experience and understanding of "The code of construction BOQ valuation ", the author introduces each component of BOQ offer, and analyzes and discusses the final determination of BOQ offer, in order to rationally confirm construction cost and to determine tender offer.
出处
《山西建筑》
2007年第10期274-275,共2页
Shanxi Architecture
关键词
工程量清单
投标报价
施工成本
税金
bill of quantities, tender offer, construction cost, taxes