摘要
介绍了钢球磨煤机的安装过程,分析探讨了钢球磨煤机运行中常见的故障及其故障产生的原固,并提出了消除和预防磨煤机烧瓦的措施,以保证钢球磨煤机的正常安全运行。
This paper introduces the installation process of steel-ball coal pulverizer, analyzes and discusses common failures and their causes in its operation, and proposes measures to eliminate and prevent bush burning of coal pilverizer, in order to ensure normal and safe operation of steel-ball coal pulverizer.
出处
《山西建筑》
2007年第10期352-353,共2页
Shanxi Architecture
关键词
钢球磨煤机
转筒
空心轴
安装
steel-ball coal pulverizer, tumbler, hollow axle, installation