摘要
在湿法烟气脱硫系统中,是否设置烟气再热系统(简称GGH)对脱硫工程投资和经济运行有较大影响,对SO2及氮氧化物(NOx)落地浓度也有重要影响,结合某电厂2×600MW燃煤机组脱硫工程,对是否设置GGH的技术经济性进行了比较。
In the system of gas desulfurization by wet process, whether GGH system will be provided, it has a larger impact on capital cost and economical operation of desulfurization project and an important effect on ground concentration of SO2 and nitrogen oxides (NO2). Combining the project of desulfurization for 2 units of 600MW coal firing sets in a Power Plant, the comparisons are made between technical and economical efficiencies of whether GGH system will be provided.
出处
《有色冶金设计与研究》
2007年第2期258-261,共4页
Nonferrous Metals Engineering & Research
关键词
烟气脱硫
GGH
氮氧化物
落地浓度
技术经济
gas desulfurization
GGH
nitrogen oxides
ground concentration
technical economy