期刊文献+

基于C++ Builder与APDL一体化的多丝焊接仿真系统

Simulation system based on integration of C++ builder and APDL for multiple-wire welding
下载PDF
导出
摘要 利用C++ Builder及ANSYS提供的二次开发工具APDL,开发了界面友好的多丝焊接有限元分析系统。借助C++ Builder设计了友好、方便、易用的人机交互界面,同时对所有复杂、难于理解和掌握的ANSYS命令流进行后台封装。系统适用于常见厚度材料的多丝焊接仿真,具有较强的纠错能力,以及稳定可靠、易于安装与扩充的特点。系统不仅能够大大减少多丝焊接仿真的工作量,而且使未掌握ANSYS软件的人员也能进行焊接仿真。 A multiple-wire welding FEA system was developed by using C++ Builder and APDL which is a secondary development tool provided by ANSYS. The friendly convenient and flexible man-machine conversation interface was designed by using C++ Builder and all the complicated and indigestible ANSYS commands were encapsulated in system background at the same time. The system is suitable for the simulation of normal thickness materials, and mistakes could be put right quickly. Its characteristics include stabilization, credibility, easy to install and expand. Not only the multiple-wire welding simulation workload can be reduced largely, but also it can be done well that who has understood the ANSYS software.
出处 《焊接》 北大核心 2007年第4期33-36,共4页 Welding & Joining
基金 广东省2005年科技计划项目(2005B10201015) 肇庆学院2006年科研项目(0630)
关键词 仿真系统 多丝焊接 有限元分析 simulation system, multiple-wire welding, finite element analysis
  • 相关文献

参考文献4

二级参考文献18

  • 1汪建华,钟小敏,戚新海.管板接头三维焊接变形的数值模拟[J].焊接学报,1995,16(3):140-145. 被引量:23
  • 2张文钺,焊接传热学,1989年,11页
  • 3Chong L M,学位论文,1982年,56页
  • 4Pavelie V,Tanbakuchi R,Auyehara O.Experimental and computed temperature historips in gas tungsten arc welding of thin plates [J].Welding Journal Research Supplement,1969,48(7):295-305.
  • 5Cant R R..The Making of a Permanent Hot Tap Connection[J]. Pipeline and Gas Journal, 2000, 227(8): 16, 20, 22, 24.
  • 6Goodfellow R, Belanger R.. Hot Tap Installed on Operating Sour-gas Line[J]. Oil and Gas Journal, 2001, 99(12): 50-55.
  • 7Hutt G, West A, Starsmore R.. Hot Tapping on a Subsea Pipeline[J]. Welding and Metal Fabrication, 1995, 63(4): 136-139.
  • 8Nemoto M, Susa M.. Hot Tap Method Developed for Heating,Cooling Pipe[J]. Pipe Line Industry, 1992, 75(1): 64-65.
  • 9Sabapathy P N, Wahab M A, Painter M J.. The Prediction of Burn-through Dduring In-service Welding of Gas Pipelines[J]. International Journal of Pressure Vessels and Piping, 2000, 77: 669-677.
  • 10Kim W S, Kin Y P, Oh K H.. The Effects of Heat Input and Gas Flow Rate on Weld Integrity for Sleeve Repair Welding of In-service Gas Pipelines[A]. In: Frank Gareau ed. Proceedings of the International Pipeline Conference (IPC) (B), 4th International Pipeline Conference, Alberta, 2002, New York: American Society of Mechanical Engineers, 2002: 1483-1492.

共引文献225

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部