本文介绍了西藏六0六水电站机电设备增容改造工程,结合改造前后水轮发电机组及电气一、二次设备的运行情况了对比,并就改造后的经济效益及社会效益进行分析。
The paper talked about the electromechanical equipment capacity increased and upgrading project of the Tibet 606 hydropower station, and then had a contrast about the before lateration operating circs with the after circs of turbine generator system and the first & secondary electric equipments. Meanwhile, it had an analyse on economic and social benefit when finishing upgrading.
出处
《中国水能及电气化》
2007年第3期55-58,共4页
China Water Power & Electrification
关键词
水电站
机电
设备
改造
Hydropower station
Electromechanical
Equipment
Alteration