对基坑断面K3+315进行了施工全过程的有限差分分析和数值模拟,并详述了模拟过程和步骤,分析的四个工况水平位移和实测数值比较吻合,说明了利用现代的模拟计算对复杂的基坑施工全过程进行实际模拟具有工程现实意义的。
This paper carries out finite difference analysis and numerical simulation of the whole process of foundation pit' K3+315 section construction,illustrates the simulating process and steps,discusses that the horizontal displacement of four analyzed construction conditions coincide with measured value,which shows that carrying out practical simulation on the whole process of complicated foundation pit construction using modern simulating calculation has operation significance.
出处
《山西建筑》
2007年第12期84-86,共3页
Shanxi Architecture
关键词
西部通道
基坑工程
变形
围护结构
western corridor
foundation pit engineering
deformation
exterior protected structure