摘要
阐述了开发项目建设过程五阶段的造价确定和控制,对薄弱环节进行了分析,并提出了一些具体的针对性控制措施,强调事先控制和事中控制,使开发项目的造价能够得到有效的控制。
It illustrates cost identification and control at five stages in construction process of development project,analyzes the weak links,proposes several concrete control measures,and emphasizes the control before and during construction,in order to make the cost of development project get effective control.
出处
《山西建筑》
2007年第12期235-236,共2页
Shanxi Architecture
关键词
造价测算
招标
限额设计
监理
索赔
cost estimation
public bidding
quota design
supervision
claim