特长富水软弱围岩隧道快速施工力学效应 被引量:3

Analysis of the mechanical effect on rapid construction of super-long soft surrounding rock tunnel with high water content
下载PDF
导出
摘要 针对雁门关隧道特长、富水软弱围岩等复杂地质条件以及工期要求紧的实际情况,采用地层—结构模式,对地层比较差的Ⅵ级围岩的稳定性进行了模拟分析,建立了隧道围岩理论模型,并对施工过程进行了数值模拟,验证了雁门关隧道快速施工的可行性,为后续工程提供一定的参考。 According to the engineering characteristics of Yanmenguan tunnel as: super long,soft surrounding rock with high water content and other geological conditions and requirements on limit time,utilizing stratum-structure mode model analysis is carried out to analysis the stability of Ⅵ surrounding rock;at the same time corresponding theoretical model is built.Numerical simulation is made for construction process,which verified the feasibility of rapid construction of tunnel and provided references for subsequent works.
出处 《山西建筑》 2007年第12期308-309,共2页 Shanxi Architecture
关键词 雁门关隧道 围岩稳定性 快速施工 数值模拟 Yanmenguan tunnel stability of surrounding rock rapid construction numerical simulation
  • 相关文献

参考文献5

二级参考文献8

  • 1朱合华,桥本正.盾构隧道管片接头衬砌系统的两种受力设计模型[J].工程力学,1996,13(A03):395-399. 被引量:28
  • 2朱合华 侯学渊 等.基坑开挖反馈设计分析.软土地基变形控制设计理论与工程实践[M].上海:同济大学出版社,1996.163-170.
  • 3朱合华,工程力学,1996年,10卷,增刊,395页
  • 4朱合华,软土地基变形控制设计理论与工程实践,1996年,163页
  • 5杨林德,岩土工程问题的反演理论与工程实践,1996年
  • 6桥本正,日本第30 回土质工学发表会讲演集,1995年,1693页
  • 7郑颖人,地下工程锚喷支护设计指南,1988年
  • 8朱合华,杨林德,桥本正.深基坑工程动态施工反演分析与变形预报[J].岩土工程学报,1998,20(4):30-35. 被引量:86

共引文献247

同被引文献3

引证文献3

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部