期刊文献+

分布式恒压自动化灌溉系统的研制 被引量:3

Study on the distributing constant pressure automatic irrigation system
下载PDF
导出
摘要 论述了分布式恒压自动化灌溉系统的系统结构,软、硬件设计方法和工程实例。通过采用变频调速器的多功能应用,实施软启动和软关机等技术手段,有效地避免了管网系统因“水锤”而爆管的现象发生;通过采用分布式系统结构和有线无线结合的经济组网方式等技术措施,极大地降低了工程建设成本和运行、维护、管理费用;重点介绍了在实践中非常有效的特殊电路和非常规处理方法,在采样的普通接点上施加100 V交流电,解决了恶劣条件下,因电接点腐蚀而影响系统长期可靠性的难题。其技术模式和设计方法,具有一定的参考价值。 In this paper the structure of automatic irrigaton system of distributing contant pressure, the design method of softwares and hardwares, and engineering examples are studied. The phenomenon of pipe explosion because of "water hammer" is avoided effectively through the applying of variable frequency speed regulation of multi-function and the implement of means of soft start and shut. The cost of engineering structure, maintainment and management are reduced greatly through the adoption of some measures, such as the distributing system structure, the combination of wire and wireless. By using the special circuit and the abnormal means of handlement, adding 100 V alternate current to the commom circuit point, we can solve the difficult problem of decayed circuit point which affect the long-term credibility of the system in the bad sitution.
出处 《排灌机械》 2007年第2期40-44,共5页 Drainage and Irrigation Machinery
基金 科技部农业科技成果转化资金资助项目(02EFN216801231)
关键词 恒压灌溉 自动控制系统 变频调速器 建设成本 维护费用 constant irrigation automatic controlled system variable frequency speed regulation construction cost maintain expenses
  • 相关文献

参考文献8

二级参考文献27

共引文献54

同被引文献29

  • 1赵辉,高胜国.商丘试区地下水动态的ANN模型研究[J].地下水,2001,23(2):78-79. 被引量:4
  • 2高胜国,黄修桥,齐学斌,樊向阳,李平,黄仲冬.基于经济组网方式的地下水限量开采自动控制系统[J].农业工程学报,2005,21(z1):20-22. 被引量:2
  • 3高胜国,黄修桥,齐学斌,樊向阳,李平.基于经济组网方式的灌溉远程自动控制系统[J].农业机械学报,2005,36(2):79-81. 被引量:9
  • 4袁丹青,丛小青,张兵.基于PLC大型喷灌恒压控制系统的研究[J].农机化研究,2006,28(3):65-67. 被引量:1
  • 5王建东,龚时宏,徐茂云,赵月芬,刘中善.微灌用水动活塞式施肥泵研制[J].农业工程学报,2006,22(6):100-103. 被引量:21
  • 6Kim Min Hee, Kim Dong Ju, Choi Jae Woo, et al. Detec- tion of inorganic chemicals in a sandy soil using TDR: Effect of probe geometry and water content [ J ]. Geo- sciences Journal, 2010,14 ( 3 ) :321 - 326.
  • 7Abdirashid Elmi, Joumana S Abou Nohra, Chandra A Madramootoo, et al. Estimating phosphorus leachability in reconstructed soil columns using HYDRUS - 1D model [ J ]. Environmental Earth Sciences, Online FirstTM, 2011.
  • 8Rakesh K Kushwaha, Pandit M K, Rohit Goyal. MODF- LOW based groundwater resource evaluation and predic- tion in Mendha sub-basin, NE Rajasthan [ J ]. Journal of the Geological Society of India, 2009,74 ( 4 ): 449 - 458.
  • 9Ibrahim S AI- Salamah, Yousry M Ghazaw, Abdul Razzaq Ghumman. Groundwater modeling of Saq Aquifer Buraydah A1 Qassim for better water management strate- gies [ J ]. Environmental Monitoring and Assessment, 2011,173:851-860.
  • 10Senthilkumar M, Elango L. Modelling the impact of a subsurface barrier on groundwater flow in the lower Palar River basin, southern India [ J ]. Hydrogeology Journal, 2011,19(4) :917 -928.

引证文献3

二级引证文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部