摘要
In the past two decades,numerous large-diameter rock-socketed piles were constructed in China to support foundations of skyscrapers,great bridges or to retain soil in potential geological hazard areas.However,drilling large-diameter rock-socketed pile holes with conventional drilling method such as rotary drilling or cable tool drilling is time-consuming and the cost is usually very high.In order to drill large-diameter rock-socketed pile holes faster at relatively low cost,the FGC15A large-diameter DTH air hammer drilling system was developed in 1987 and was given the second-class award by Ministry of Geology and Mineral Resources in 1991.Since it was innovated the drilling system has been used in more than twenty important and tough projects on land,and wonderful results were acquired.At the same time the large-diameter DTH air hammer drilling system was improved continuously.The FGC15D is the latest version of the technique.
In the past two decades, numerous large-diameter rock-socketed piles were constructed in China to support foundations of skyscrapers, great bridges or to retain soil in potential geological hazard areas. However, drilling large-diameter rock-socketed pile holes with conventional drilling method such as rotary drilling or cable tool drilling is time-consuming and the cost is usually very high. In order to drill large-diameter rocksocketed pile holes faster at relatively low cost, the FGC15A large-diameter DTH air hammer drilling system was developed in 1987 and was given the second-clasa award by Ministry of Geology and Mineral Resources in 1991. Since it was innovated the drilling system has been used in more than twenty important and tough pro- jects on land, and wonderful results were acquired. At the same time the large-diameter DTH air hammer drilling system was improved continuously. The FGC15D is the latest version of the technique.
关键词
高楼
地基
钻探系统
洞穴
DTH air hammer
drilling system
pile hole drilling